Gasoline and Desiel Marine Loading Arm

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2020-07-22 15:48
Browse the number: 482
inquiry
Company Profile
 
 
Product details

Technical Features


  • Used for loading and unloading oil products, including gasoline, diesel, HSD, PD, G92, G95, G97, etc.

  • Each marine loading arm is equipped with 6 swivel joints, the arm can move with 6 degrees of freedom. One insulated swivel joint prevents static conduction between the wharf and the tanker. A grounding system is installed at the bottom of marine loading arm column, and static conductive tapes are installed at both ends of all swivel joints and flange connection.

  • The ERC with double ball valve structure can quickly and safely cut off the connection with the tanker in an emergency.

  • The wire ropes of drive systems meet the technical requirements of GB / T8918, and the safety factor is more than 5, exceeding the requirements of OCIMF.

  • A nitrogen purge system is installed at the top of marine loading arm to remove the remain medium in the main pipeline after loading and unloading is completed.

  • ERC can quickly shut off the upper and lower ball valves, disengage the hoop, fully ensuring safety and reliability in an emergency or when the ship drifts beyond the envelope scope of marine loading arm.

Product Parameters


  • Medium:

    Gasoline

    Diesel

    HSD

    PD

    G92

    G95

    G97

    Other oil products as required.

    Nominal size:

    4 ″ ~ 20 ″

    DN100-DN500

  • Design pressure: CL150, CL300.

  • Nominal temperature: -19℃〜+ 200℃


To learn more about the product


http://www.cclpec.com/

Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]